Practical completion inspection should be late next week I reckon (hope!) from there anything to be fixed will be done and handover. Floors will take two days.
Friday, 28 February 2014
Tiles, electrical and roller doors
Tiling the in the wet areas being completed today. Lucky the tiler was there so we could get in to take a look. All the electrical fit off is finished and power is on. The roller doors are not other ones we chose but are probably better. They are the contemporary design, not the caprice that we chose. Unsure as to whether they can put the Perspex windows in them though. If not we will go back to the originals. Plumbers should be back in this week to fit off taps, toilets, baths, sinks, shower heads etc. shower screens will take a while as they need to measure and manufacture to suit.