Some more progress this week. Hebel is complete and the electricians have been through. 40 odd lights and about the same amount of power points so cables everywhere! Going in to do some speakers and network cable on weekend before plaster starts on Monday. Ducted vacuum pipes have been installed including a hide-a-hose where the vac hose goes up into the pipe work when not in use. Pretty cool stuff. Heating and cooling goes in tomorrow. Finally sorted out the refridgerated cooling. Four separate zones with sensors to automatically turn on and off the heating in certain areas as required. Amazing system but bloody expensive too! Anyway you don't want to skimp on the important stuff. Check out the photos. Base coat of render is due to start tomorrow. Put more phots up after the weekend.