Monday, 7 April 2014

Some pre handover photos

Handover on Wednesday at 9:30. Floorers in at 10:00. Hopefully all the fixes have been finished. Of particular note was the absence of the 3 phase cable to the air conditioner condenser. Some plumbing needed to be fixed and cleaned up as well.  The light inside the garage due to the windows in the doors is terrific.

Going to start concreting the paths next Monday on the dead side of the house. Then do the slab behind the garage and paths on the golf club side. Fencers are putting the posts and rails in only to aid in the delivery of the concrete to minimize barrowing. Putting a colour oxide in the concrete similar to the brown colour of the darker render for something different. 
splashback

kitchen bench and Rian

Cint checking one of the 20+ drawers

full extension runners and soft closers

kitchen sink

kitchen sink

vegie sprayer tap. different but versatile

walk in pantry

site to hang TV in living room

Laundry looking into walk in linen

laundry from other angle

powder room

entry to house

theatre room. skirts and architraves painted to match walls in matt finish

theatre from other angle

theatre

garage doors with windows

ensuite

spa in ensuite

shower in ensuite

toilet and double basins

upstairs loungeroom

air intake for heater and cooler

air intake and upstairs toilet

upstairs main bathroom

upstairs bathroom

upstairs bathroom from Rian's walk in robe

Rian's room

Jessica's Ensuite

Shower in Jessica's ensuite

Jessica's Shower

Living Room looking toward Rian's room, void and stairs

kitchen and dining room from living room

same as above

Alfresco from living room window

from living room window toward back of garage and golf course. down pipe installed.

same as above

No comments:

Post a Comment